• About
    • Our Team
    • Awards & Recognitions
    • History – 100+ Years Strong
    • Eckman Cares
  • Portfolio
    • Public
    • Office / Flex Warehouse
    • Retail Space
    • Storage Facilities
    • Tenant Improvement
    • Educational Facilities
  • Services
    • General Construction
    • Design-Build
    • Tilt-Up
    • Preconstruction
    • Project Phasing
  • News
  • Careers
  • Contact
  • About
    • Our Team
    • Awards & Recognitions
    • 100+ Years Strong
    • Eckman Cares
  • Portfolio
    • Office / Flex Warehouse
    • Retail Space
    • Tenant Improvement
    • Public
    • Storage Facilities
    • Educational Facilities
  • Services
    • General Construction
    • Preconstruction
    • Project Phasing
    • Design Build
    • Tilt Up
  • News
  • Careers
  • Contact

Sharp Warehouse II

Eckman Construction was the general contractor and self-performed all site and building concrete work for two identical concrete tilt-up panel buildings. The development has room for five tenants that currently include a gymnastics gym, mattress retail store, warehouse space, and a distribution warehouse for a vitamin/supplement manufacturer.

Due to the building’s proximity to overhead electrical transmission lines, safety coordination was critical. It also required a unique diagonal design for the corner of the building to ensure that the required distance from the lines met regulations. Regardless of this potentially risky situation, all team members were safe, and the schedule was met to allow the tenants timely occupation of their respective spaces.

Project Details

Project Location: American Fork, UT
Architect: JZW Architects
Size: 60,800 SF
Schedule: 9 months

Project Images

3032 S 1030 W, Ste. 101
Salt Lake City, UT 84119
contactus@eckmanconst.com
801.908.0604
Eckman Construction is a Proud Member of:
Quick Links
  • Contact
  • Services
  • Portfolio
  • News
  • Careers